Our 10 Point Plan to Guaranteed Success
1. Remove:
We remove existing surface in order to prepare the sub-
-
2. Rip:
Rip and scarify soil to approximate depth of 150mm where required
-
3. Level:
The area will be graded to achieve the best falls obtainable for drainage, having regard to existing conditions and paving tolerances
-
4. Compact:
The area will be watered to its optimum moisture content and compacted
-